IGNOU Result December 2024: The Indira Gandhi National Open University (IGNOU), a leading name in open and distance learning, conducts Term-End Examinations (TEE) twice a year—in June and December. The results for the December 2024 session are among the most anticipated updates for lakhs of students across India and abroad.

This article provides a comprehensive guide to help you understand everything about IGNOU December 2024 TEE results—from checking your results online, understanding the grading system, the revaluation process, and resolving discrepancies, to downloading your grade card.
About IGNOU December TEE 2024
The IGNOU Term-End Examinations for the December 2024 session are conducted for various undergraduate, postgraduate, diploma, certificate, and doctoral programs. These exams are crucial because they assess the students’ theoretical understanding and are often combined with assignment marks and practicals to form the final result.
IGNOU allows flexibility in examination schedules and evaluation timelines, which is a blessing for students who pursue studies alongside jobs, business, or personal commitments. The December TEE 2024 was conducted in offline mode across hundreds of exam centers.
Important Dates
| Event | Date |
|---|---|
| Exam Start Date | December 1, 2024 |
| Exam End Date | January 5, 2025 |
| Evaluation Begins | Mid-January 2025 |
| Early Result Release (Phased Manner) | Late January 2025 |
| Final Result Declaration | February to March 2025 |
How to Check IGNOU December 2024 Result Online?
IGNOU publishes the December 2024 TEE results in a phased manner. You can check your result by following these simple steps:
- Visit the official result link:
Check IGNOU Result December 2024 - Enter your 9-digit Enrollment Number.
- Click on ‘Submit’ or ‘Search’.
- Your result will be displayed on the screen, showing course-wise marks.
- Download or print the result for future reference.
Note: Results are uploaded batch-wise. If your result is not displayed immediately, wait for a few more days and try again.
Understanding IGNOU Grade Card
After the results are declared, students must also check their Grade Card, which consolidates assignment, theory, and practical marks.
The Grade Card includes:
- Course Code
- Assignment Marks
- Term-End Exam Marks
- Practical Marks (if applicable)
- Remarks (Completed/Not Completed)
Students can verify their academic status and eligibility for award of degree or diploma based on this card.
Grade Card Categories
- Completed – Passed all required components
- Not Completed – One or more components (assignments, theory, practical) pending
- Absent (AB) – Did not appear in the exam
- Not Submitted (NS) – Assignment or Project not submitted
Minimum Qualifying Marks
The passing criteria differ by program level:
| Program Level | Theory Pass Marks | Assignment Pass Marks |
|---|---|---|
| Undergraduate | 35% | 35% |
| Postgraduate | 40% | 40% |
Practical courses also require minimum marks, usually:
- Up to 4 Credits: Minimum 50%
- Above 4 Credits: Minimum 50%
If you score less than the minimum in any component, you must reappear or resubmit in the next cycle.
Revaluation Process
IGNOU provides students with an opportunity to request a revaluation if they are not satisfied with their marks.
Key Points
- Revaluation applies only to theory papers.
- Applications must be submitted within 30 days from result declaration.
- A fee (usually ₹750 per subject) must be paid online or via demand draft.
- Revaluation results are usually declared within 30-45 days.
Note: There is no revaluation for assignments, practicals, or project work.
Common Problems and How to Fix Them
1. Result Not Showing
- Reason: Batch-wise result upload.
- Solution: Wait and try after a few days.
2. Incomplete Grade Card
- Reason: Pending assignment or practical marks.
- Solution: Check assignment submission status and contact your study center.
3. Incorrect Marks
- Solution: Apply for revaluation or contact regional center.
4. Name or Course Code Error
- Solution: Email to IGNOU Regional Centre with proof.
When to Expect Final Result Updates?
Although early results are uploaded in phases, IGNOU takes time to update all the course marks (especially project work, practicals, and assignment marks). The final consolidated result and grade card are typically available by March or April 2025.
What to Do After Getting the Result?
- Check the grade card for full marks.
- Apply for revaluation (if needed).
- Clear any pending assignments or exams.
- Ensure project submissions have been evaluated.
- Download the provisional certificate once eligible.
- Apply for convocation, if all requirements are completed.
Important Links and Information
Here is a quick reference table for all important resources related to IGNOU December 2024 Result:
| Title | Link |
|---|---|
| Check IGNOU Result December 2024 | Click Here |
| IGNOU Grade Card | https://gradecard.ignou.ac.in/gradecard/ |
| Revaluation Form | Available at IGNOU Regional Centres or Online Portal |
| Assignment Status | https://admission.ignou.ac.in/changeadmdata/StatusAssignment.ASP |
| Hall Ticket Download | https://hall_ticket.ignou.ac.in |
| Exam Form Submission | https://exam.ignou.ac.in/ |
FAQ about IGNOU Result December 2024
When will the IGNOU December 2024 results be declared?
The IGNOU December 2024 Term-End Exam results are generally declared in a phased manner, starting from late January 2025. The final consolidated results, including all components (assignments, theory, practicals, and projects), are usually available by March or April 2025.
Where can I check my IGNOU December 2024 result?
You can check your result online through the official result portal here:
???? https://ignoubank.com/ignou-result/
What details are required to check the result?
You only need your 9-digit Enrollment Number to check the result.
Why is my result not showing even though others have received theirs?
IGNOU uploads results in phases. If your result is not yet visible, don’t worry—it may still be under evaluation. Check again after a few days.
What is a grade card, and when will it be updated?
The grade card shows a consolidated view of your assignment marks, term-end marks, practicals, and overall status. It is updated progressively after the result declaration and may take time, especially for project or practical components.
What are the minimum passing marks for IGNOU exams?
Undergraduate (UG) programs: 35% in theory and assignments
Postgraduate (PG) programs: 40% in theory and assignments
For practicals, generally 50% is required.
How can I apply for revaluation?
You can apply for revaluation of theory papers within 30 days of result declaration. The fee is ₹750 per subject. The application can be made online or through your regional center.
Can I apply for revaluation of assignments or practicals?
No, revaluation is only applicable to theory papers. Assignments, practicals, and project evaluations are not eligible for rechecking.
I’ve passed the theory but failed in assignments. What should I do?
You’ll need to resubmit the assignments in the next session before the submission deadline and then wait for updated evaluation.
What does ‘Not Completed’ mean in the grade card?
“Not Completed” indicates that one or more components of a course (e.g., assignment, practical, or theory) have not been passed or submitted, and you need to clear them in the next attempt.
What if I find an error in my result or grade card?
In case of any discrepancy (wrong marks, course code, name mismatch), you should contact your IGNOU Regional Centre immediately and submit a written request along with proof (such as hall ticket or assignment submission slip).
How long will it take to receive the final marksheet or certificate?
After all components (assignments, theory, project/practicals) are successfully passed, IGNOU usually dispatches the provisional certificate and final marksheet within 2–3 months. Degree certificates are awarded during Convocation.
Conclusion
The IGNOU Result for the December 2024 Term-End Examination is a major milestone for students pursuing various courses through distance and open learning. With IGNOU’s flexible system, it’s normal for some results to take time, especially for students who submitted assignments or project work late.
If you’re among those who are waiting, don’t panic. IGNOU releases results in phases. Be sure to stay connected to the official portals, check your grade card regularly, and be proactive about your assignments, projects, and revaluation process.
For real-time updates, use the result link:
???? Check Your IGNOU Result December 2024